Description

more
The Five-Year Transportation Program (5YTP) is an annual document listing road and bridge projects planned for the next five years.  A snapshot of 5YTP projects is produced annually and presented for approval to the State Transportation Commission.  The 5YTP snapshot is later archived and the document is posted on MDOT’s Web site.  A Web-based interactive state map is available which plots individual projects for the public to easily view. Please see the MDOT Metadata Form for additional information or visit the 5YTP Website. Update Cycle: The Five Year Transportation Program (5YTP) layer was last updated in January 2016 and is updated on an annual basis.Data Quality: The GIS layer is generated from MDOT’s MAP database 5YTP archive snapshot.Coverage: This layer covers all projects in the current 5YTP snapshot.Contact: Eric Mullen, mullene@michigan.gov

Dataset Attributes

  • UNIQ_GIS_ID
    Number
  • FIVE_YEAR_PLAN
    Text
    {"value"=>"2017-2021", "count"=>439} ()
  • JOB_ID
    Number
    45790 to 130848
  • PHAS_ID
    Text
    {"value"=>"A", "count"=>413} (), {"value"=>"C", "count"=>8} (), {"value"=>"Z", "count"=>6} (), {"value"=>"D", "count"=>6} (), {"value"=>"B", "count"=>5} (), {"value"=>" ", "count"=>1} ()
  • RTE_NAME
    Text
    {"value"=>"I-94", "count"=>117} (), {"value"=>"I-75", "count"=>79} (), {"value"=>"I-69", "count"=>41} (), {"value"=>"I-96", "count"=>39} (), {"value"=>"US-23", "count"=>13} (), {"value"=>"M-39", "count"=>13} (), {"value"=>"US-127", "count"=>8} (), {"value"=>"US-131", "count"=>6} (), {"value"=>"M-66", "count"=>6} (), {"value"=>"Exit 183", "count"=>5} ()
  • RPT_LOC_DESC
    Text
    {"value"=>"19 structures on I-69 in Eaton County", "count"=>19} (), {"value"=>"at Various locations in Kalamazoo area", "count"=>16} (), {"value"=>"13 bridges between Airport Rd and I-96 ", "count"=>13} (), {"value"=>"12 bridges on US-23 in Washtenaw County", "count"=>12} (), {"value"=>"Ten Structures Along I-94, Macomb County", "count"=>10} (), {"value"=>"6 structures on M-39, Detroit", "count"=>10} (), {"value"=>"at Eureka, Northline, US-24 Conn", "count"=>10} (), {"value"=>"9 bridges in Arenac County", "count"=>9} (), {"value"=>"9 bridges on I-75 in Monroe County", "count"=>9} (), {"value"=>"8 bridges from West River drive east to Coit Ave", "count"=>8} ()
  • WK_TYPE_DESC
    Text
  • SUB_CAT_DESC
    Text
    {"value"=>"Bridge CPM", "count"=>158} (), {"value"=>"Bridge Replacement", "count"=>131} (), {"value"=>"Bridge Rehabilitation", "count"=>106} (), {"value"=>"Bridge CSM", "count"=>17} (), {"value"=>"Reconstruction", "count"=>7} (), {"value"=>"Major Widening", "count"=>7} (), {"value"=>"Bridge Miscellaneous", "count"=>6} (), {"value"=>"Road Rehabilitation", "count"=>3} (), {"value"=>"Resurface", "count"=>3} (), {"value"=>"Planning, Research & Design", "count"=>1} ()
  • PROJ_CAT_DESC
    Text
    {"value"=>"Repair & Rebuild", "count"=>426} (), {"value"=>"Bridge", "count"=>7} (), {"value"=>"Road", "count"=>5} (), {"value"=>"Planning, Research & Design", "count"=>1} ()
  • START_YEAR
    Number
    2017 to 2021
  • END_YEAR
    Number
    2017 to 2021
  • TSC_DESC
    Text
    {"value"=>"Detroit TSC", "count"=>119} (), {"value"=>"Lansing TSC", "count"=>41} (), {"value"=>"Kalamazoo TSC", "count"=>35} (), {"value"=>"Taylor TSC", "count"=>30} (), {"value"=>"Brighton TSC", "count"=>29} (), {"value"=>"Bay City TSC", "count"=>27} (), {"value"=>"Macomb-St. Clair TSC", "count"=>25} (), {"value"=>"Grand Rapids TSC", "count"=>25} (), {"value"=>"Oakland TSC", "count"=>16} (), {"value"=>"Marshall TSC", "count"=>15} ()
  • PR_GEOM_LRS_PT
    Number

Related Datasets